Wagga Water Treatment Plants

Automated cantilever gates installed at two water treatment plant sites in Wagga.

Project Scope

360 Protect supplied and installed automated cantilever gates for two water treatment plant facilities in Wagga.

The first gate is a 12 metre cantilever gate in Crimped Spear style, supported by a bollard and chain protective fence.

Automation for this gate is powered by a FAAC C850 fast slide gate motor with chain drive, complete with audible buzzer alert.

The second installation features a 5.6 metre cantilever gate, powered by a Centurion D10 motor with battery backup and operated via transmitter access.

Project Gallery

Browse installation photos from both automated gate projects at the Wagga water treatment plant sites.

Key Features

Critical infrastructure facilities require strong and dependable gate systems designed for long-term performance.

Large Cantilever Gate

12 metre crimped spear gate designed for heavy-duty site access.

High-Performance Automation

FAAC C850 motor with chain drive provides powerful operation.

Backup Power System

Centurion D10 motor includes battery backup for reliability.

Secure Site Access

Transmitter operation provides controlled entry for authorised staff.

From First Call to Final Handover: A Seamless Process

No pressure, no obligation. Just straightforward expert guidance from start to finish.

Step 01

Discovery
Call

We learn your security needs, challenges, and goals.

Step 02

Site Visit &
Quote

We assess the site and provide a detailed, obligation-free proposal.

Step 03

Install
Commences

Our experienced team installs your solution with minimal disruption.

Step 04

Handover & Aftercare

Our service team are committed to providing full after-sales care and support, to keep your site secure.

Completed Projects

Explore a selection of our completed installations across Australia.

What Our Clients Say

Trusted by Businesses Across Australia Since 1975